Raquel Sánchez, Minister for Transport, Mobility and Urban Agenda, attended the inauguration ceremony along with other authorities from the political and business sphere

Infrastructures
We expand the Tenerife Sur airport
With the construction of a new building that connects terminals 1 and 2 into a single area and enables a total of 14,000 m2 of net usable area.
26/05/2022
Infrastructures
We exceed the 75% progress mark on the new runway of Jorge Chávez Airport, Lima
The consortium led by Sacyr finishes paving the runway and heads straight to the final stretch of the project
02/03/2022
People
Get to know the high-flying team at Jorge Chávez Airport in Lima!
Our colleagues are building the new landing strip of Jorge Chávez International Airport in Lima. A true challenge, ready to take off.
11/11/2021